A Flexo Press Makeready Checklist That Shortens Setup on Every Job

Why the flexo press makeready checklist matters more on short runs
A job comes off the press, the customer is happy, and the estimator opens the job bag at invoicing. The quote assumed a quick changeover. The press log, if there is one, says the crew chased registration for most of an hour, swapped an anilox roll that was not on the ticket, and ran a first-article round twice because the white was thin. Nobody did anything unusual. The estimate simply carried a setup number nobody had ever measured, and the job's margin went out the back of the press as waste web and idle hours.
That is the usual story with makeready. On a long run the setup cost spreads across so many labels that it hides. On a short run it is most of the cost. If setup lives in the operator's head, the quote is a guess and every changeover is a fresh negotiation with the press.
By the end of this article you will have a flexo press makeready checklist you can adapt for your own floor, a way to log each makeready so it becomes a number, and a way to feed that number back into your quotes.
What makeready actually costs, and why it is an estimating problem
Makeready is everything between the last good label of the previous job and the first good label of this one: mounting plates, setting impression, dialling in ink, threading and tensioning web, installing the die, and bringing registration and colour into tolerance. Three things get consumed while that happens: press time, substrate that never becomes a saleable label, and ink and plate wear.
The mechanism matters for pricing. Press time is charged at your hourly rate with overhead loaded in. Wasted substrate is charged at your MSI cost. Both are fixed per job rather than per label, so the per-label effect is simply the fixed amount divided by the run length. A worked example with deliberately round inputs: if one makeready costs $60 in time and waste, a 1,000-label job carries $0.06 of it on every label, and a 10,000-label job carries $0.006. The setup did not get cheaper; it got spread thinner. This is the same arithmetic behind the flexo-versus-digital crossover, and it is why a shorter, more repeatable setup moves your crossover point more than most people expect. We cover the cost-build side in makeready waste in flexo, explained.
No makeready time or waste percentage appears in this article on purpose. They vary with press, crew, substrate, colour count and job complexity, and a borrowed benchmark is worse than none. The right figure for your quote is the one you measure on your own press.
The pre-run routine: a flexo press setup procedure in six passes
The order below is a sensible default for a narrow-web press and the core of any flexo press makeready checklist. Reorder it to suit your machine, but keep it written down and keep it the same every time. The value of a checklist is not the individual items. It is that no job depends on who happens to be on shift.
1. Job ticket and artwork check. Confirm the job number, revision of the artwork, repeat, number of colours, finishing and the specified substrate before anything is mounted. A wrong revision found after the first article costs the whole setup again.
2. Substrate and web path. Confirm the material on the press matches the ticket: face stock, adhesive, liner and width. Check roll condition, thread the web, and set tension. A wrong-width or wrong-adhesive roll is a stop, not a note on the log.
3. Plates and anilox. Verify each plate against its colour station, check plate condition and mounting accuracy, and confirm the anilox roll in each station matches the ticket for the ink and coverage required. The roll choice drives ink laydown, so a substitution here changes the look of the job. If your team has no consistent rule for matching roll to job, read how to select anilox BCM before you write that line of the checklist.
4. Ink and viscosity. Confirm the right ink for the colour and substrate, check viscosity and temperature against your standard, and make sure the doctor blade and chamber are clean and seated. Record anything mixed or adjusted at the press, because that is setup time that never shows on a ticket.
5. Die and converting. Fit the correct die, set depth of cut, and check the matrix and waste rewind path. A die that cuts through the liner, or not through the face, shows up as scrap that looks like a printing problem.
6. Registration, colour and first-article sign-off. Bring the job into register, compare colour to the approved standard, check cut-to-print position, and take a first article for sign-off before the press goes to run speed. Write down the time you declare "good" and the footage or labels spent to get there.
Notice what each pass shares: a stop condition. A checklist that only lists tasks lets a crew tick through a known problem. One that says what to do when an item fails keeps a bad setup from becoming bad product.
Log the makeready, or the checklist is only a habit
A checklist shortens setup because someone eventually looks at the data. That means a makeready log with a few fields captured on every job: job number, press, colour count, time makeready started, time first good label was produced, waste during makeready, and the reason for any restart or rework. Keep the reasons short and from a fixed list, such as plate issue, ink, registration, substrate, die, artwork or crew changeover, so the entries can be counted later.
Two habits keep the log honest. First, separate makeready waste from run waste; they have different causes and different fixes. Second, log the first job of a shift or a long changeover the same way as any other. The cheap jobs are not where the surprises hide.
After a few weeks you can sort the log by cause. This is where a Pareto view of printing waste earns its keep: a small number of causes usually account for most of the lost time, and fixing one of those is worth more than polishing a checklist item nobody trips over. Which causes dominate depends on your floor, so look at your own data and do not assume.
How to reduce makeready time on a flexo press, without rushing the crew
Most of the reduction comes from moving work off the critical path, not from working faster during it.
- Stage before the press stops. Pull plates, anilox rolls, die and the next substrate to the press while the current job is still running, so the changeover starts with everything within reach.
- Standardise what can be standard. Fixed anilox assignments for common colours, consistent plate mounting references and a house viscosity target remove decisions from the changeover.
- Fix the cause, not the symptom. If the log keeps naming registration, look at plate mounting and web tension rather than adding another registration check.
- Stop the repeat restarts. A first article that fails for something the checklist would have caught is the clearest sign a step is missing or skipped.
Waste reduction beyond makeready is a wider topic, and reducing waste in label printing covers the rest of the press floor.
Feeding the measured number back into the quote
A measured makeready is only useful if it reaches the estimate. In a quoting engine, makeready appears as a waste allowance and a setup time per job, set alongside the press-speed curve for the job's colour count. If you want to see how run speed interacts with colour count, press speed by colour count walks through it. When the allowance in the estimate is a real figure from your log, rather than a round number somebody picked once, the quote starts to reflect what the press actually does.
FlexoCommand's quoting engine carries makeready waste, per-colour plate cost, die amortisation and hourly rate with overhead as separate inputs, and its estimated-vs-actual job costing sets what you quoted beside what the job consumed. That comparison is what shows whether your setup assumptions hold. Excel can do the same sum, and for a single press it often does the job well until a stale cell or a copied formula quietly breaks it. The reason to move the calculation is not that Excel is bad. It is that a log, an allowance and a variance each live in one place and stay connected.
A setup-sheet generator is on the roadmap, and when it ships it will build on this same documented routine. Until then, the routine itself is what you can put on the floor this week.
Get the checklist and the logs
If you would rather start from a finished routine than a blank page, the Press Setup & Makeready Checklists are a documented pre-run routine for the press: a PDF guide plus the Excel logs that record it. Whichever way you build your flexo press makeready checklist, run the same checklist on every job for a few weeks, log every makeready, and read the log before you change anything. The first thing it will usually tell you is that the setup time in your quotes was never the setup time on your press.